View on GitHub

Cross-Disciplinary Software Team Spaces

A Pattern Language

Accessible & Code-Compliant Design

Summary

Design spaces that everyone can use. Include daylight access, universal accessibility, and healthy indoor climate. Create inclusive work environments that support neurodiversity and varying abilities while meeting legal requirements.

Context

Software team spaces must follow building codes and accessibility rules while promoting health, well-being, and inclusivity for all team members. Modern teams include people with diverse physical, cognitive, and sensory needs. Design should accommodate these needs from the start, not add them later as afterthoughts.

Problem

Workspaces that don’t meet accessibility standards exclude potential team members. Poor indoor climate and lack of daylight hurt productivity and well-being. Many organizations treat accessibility as an afterthought, creating segregated or compromised solutions instead of truly inclusive environments. Organizations often overlook sensory accessibility needs, which creates barriers for neurodiverse team members.

Solution

Design all team spaces to exceed accessibility requirements. Use universal design principles. Include abundant natural light with controllable systems. Maintain optimal air quality and temperature with individual control options. Create inclusive environments that accommodate diverse physical, cognitive, and sensory needs from the start.

Norwegian Building Code Compliance (TEK17)

Physical Accessibility Requirements

Daylight and Indoor Climate Standards

Forces

Accessibility Compliance Checklists

Physical Accessibility Checklist

Sensory Accessibility Considerations

Visual Accessibility

Auditory Accessibility

Neurodiversity and Cognitive Support

Retrofit Guidance for Existing Spaces

Priority 1: Critical Accessibility (Immediate)

Priority 2: Enhanced Inclusion (6-12 months)

Priority 3: Universal Design Excellence (12-24 months)

Compliance Verification and Monitoring

Regular Assessment Schedule

Documentation Requirements

Common Retrofit Challenges and Solutions

Challenge: Limited Floor Area

Challenge: Historic Building Constraints

Challenge: Budget Limitations

Challenge: Open Office Acoustic Issues

Sources